Sunday, August 31, 2014
Friday, August 29, 2014
Not Liquid Roofing weather.....
I was hoping to apply the new roof coating today but the weather looks to bad. Chance of thunderstorms from this morning until late Saturday night. Maybe I can apply on Sunday or Labor Day. I really need to get this checked off my list.
Saturday, August 16, 2014
Tuesday, August 12, 2014
Monday, August 11, 2014
Saturday, August 2, 2014
Solar rewiring project.
One of the biggest challenges for the new solar "system" is relocating the battery to the new location where the bank of 4 batteries will reside. I need to relocate them both for better current flow and for better weight distribution.
This is the original battery box. About two thirds of the way back on the trailer.
This is the new location. The front storage bay on the fifth wheel. In here, I can position the batteries direct center on the trailer for better weight distribution. The original location would have put too much weight on one side. Once installed they will weigh about 280 lbs.
This was a BITCH!!!
The undercarriage is all sealed being the Designer Series is considered a 4 season camper. I had a heck of a time finding a route from the original battery box to the front, and from the front back to the AC breaker box. I got it, but it took two full days.
Big Job.
Cleaning the roof to prepare for the seam/seal replacement and the new roof coating. All in preparation for the (4) new solar panels.
Subscribe to:
Posts (Atom)